Production commenced on 30.5.20, by advancing through the existing tunnel along the Gold Vein towards the projected highest-grade section of the vein. During the beginning of extraction, whenever possible, valuable mineral was stockpiled for commercialization.

In parallel with the drilling campaign we have commenced production from a different location in the Tunnel allowing both to proceed unhindered. As we established and organized the extraction parameters we began to stock pile mineral ready for processing and sale starting the projects cash flow.


All mining projects require a “ramp up” period, this is the period of time it takes to develop underground access to the ore body from multiple points, purchase underground machinery, build campsite, negotiate with processing plants based on the quality of our ore. The more access and the more fronts that have mineral, the more tonnage we can extract. Increasing earnings and profitability.